A.It's sterilizing power.
A.Product Listis available on a separate page.
ああああああああああああああああFrequently Asked Questions Page
A.There are four main types: surface layer improvement method, pipe pile method, columnar improvement method and high speed method.Please refer to a separate page for more information.
ああああああああああああああああああああああTo a separate page
A.the work of burying pipes underground in two ways: open and non-open.Microtunneling belongs to a non-open-cut construction method and is excellent in reducing pollution such as vibration and dust, and in suppressing the effects of traffic and the lives of citizens.・・・・・To a separate page
ああああああああああああああああああああああTo a separate page
A.We focus on public works, and we can install any type of civil engineering work.IMPROVEMENT OF ROAD PAVEMENT WORK, REVETMENT REPAIR WORK, AND BUS STOP・・・・To a separate page
ああああああああああああああああああああああTo a separate page
〒134-0085
3-24-4 Isemotobil 2F Minami Kasai,
Edogawa-ku, Tokyo
TEL +81-3-6808-2642
FAX +81-3-6808-3476
E-mail commande@tellustec.co.jp